When sizing heating and chilled water pipework, the maximum water velocity should be limited to avoid noise and prevent erosion or corrosion damage occurring and the minimum water velocity should be sufficient to prevent suspended matter settling out leading to system deterioration.
Posts published in March 2024
Install a deaerator at the system hottest point: outlet from a boiler or inlet to a chiller.